AirDate: 4/4/2015 |
Overview: With the second floor sanded, stained and sealed, the crew commences work on the first floor; the custom refrigerator panels are spotlighted; and a chest of drawers is re-purposed as the sink base in the powder room. Also: local designer Robin Gannon shows how she decorated 22 rooms of an historic inn. |